We started elevator installation at the new AC Hotel & Residence Inn by Marriott in Oakland. Completing the first two (of five) is critical to obtain a temporary use permit, which will allow the removal of the man lift. Once that’s done, we can frame and close up the side of the building.  Working select overtime with multiple shifts, we anticipate completion on the first two elevators to take 14 weeks, to be followed by the installation of the remaining three elevators.